This automatic roller clutch assembly machine features individually cam- operated stations, providing easier set-up and maintenance. Two shuttle cars, two springs and two rollers are placed at a time, allowing for smoother, more precise assembly. This machine can produce 225 pieces per hour at 100% efficiency, with a cycle time of 16 seconds.

The sequence of operations is:

1. Load cage

2. Orient cage

3. Assemble shuttle cards

4. Assemble springs

5. Idle

6. Assemble rollers

7. Inspect

8. Unload cage assembly .